Remove Parts Remove Plug-in Remove Wichita
article thumbnail

Boeing Agrees to Buy Spirit AeroSystems, a Longtime Supplier

Baua Electric

Boeing said on Monday that it had agreed to buy a major supplier, Spirit AeroSystems, ending a nearly two-decade experiment in outsourcing production of major components of its commercial planes, including the body of the 737 Max and parts of the 767, 777 and 787. The deal, which was widely expected, was valued at $4.7 billion in stock or $8.3

Buy 52
article thumbnail

National Drive Electric Week 2023 Recap: Let’s Give Them Something To Talk About

Plug in America

Disappointed but undeterred, we went to work and launched National Drive Elect ric Week (originally called National Plug In Day), thinking we would have had a better chance of coverage h ad our parade been part of a nationwide observance. Little else had been delivered in any significant number. It didn’t matter.

Golf Cart 111
article thumbnail

Boeing Says Added Inspections Are Raising 737 Max Production Quality

Baua Electric

a Boeing executive, Elizabeth Lund, also provided new detail about how the 737 Max left the plant missing four critical bolts that secured the panel, known as a door plug, in place. The body is made in Wichita, Kan., Speaking to reporters this week at the company’s factory in Renton, Wash., The benefits have been really tremendous.”

article thumbnail

Boeing Angers Safety Officials With Disclosures on 737 Max Incident

Baua Electric

Elizabeth Lund, a Boeing executive, provided new details on Tuesday about how the plane involved in the incident left the plant apparently without four critical bolts that secured the panel, known as a door plug, in place. Addressing reporters at a company factory in Renton, Wash., Addressing reporters at a company factory in Renton, Wash.,

Alaska 52
article thumbnail

‘Shortcuts Everywhere’: How Boeing Favored Speed Over Quality

Baua Electric

And some suppliers have struggled to adhere to quality standards while producing parts at the pace Boeing wanted them. Less than two months later, an Alaska Airlines 737 Max plane with eight hours of total flight time was briefly grounded until mechanics resolved a problem with a fire detection system. But since Jan.

article thumbnail

Boeing Reinstalled Panel That Later Blew Out of 737 Max Jet

Baua Electric

The employees opened the panel, known as a door plug, because work needed to be done to its rivets — which are often used to join and secure parts on planes — said the person, who asked for anonymity because the person isn’t authorized to speak publicly while the National Transportation Safety Board conducts an investigation.

Wichita 52