article thumbnail

Oregon opens first phase of West Coast Electric Highway

Green Car Congress

The Oregon Department of Transportation (ODOT), along with charging station partner AeroVironment and the Oregon Department of Energy (ODOE), opened the first phase of the West Coast Electric Highway, which is anticipated to eventually stretch along Interstate 5 from the Canadian to Mexican borders. Earlier post.).

Oregon 231
article thumbnail

Materials Company EnerG2 Breaks Ground on Plant for Ultracap Electrode Materials

Green Car Congress

In designing and constructing the a manufacturing facility to support this approach, EnerG2 will partner with Albany-based Oregon Freeze Dry, Inc. In addition to the federal stimulus funding, EnerG2 since inception has raised over $14.5 OFD), a current manufacturing partner. million in equity financing.

Companies 186
article thumbnail

Underwriters Laboratories Named Exclusive Nationally Recognized Testing Laboratory for The EV Project

Green Car Congress

The EV Project began in October 2009 when ECOtality’s eTec was awarded a federal stimulus grant of nearly $100 million from the DOE, and will deploy 4,700 Nissan LEAF EVs for the three-year study.

San Diego 186
article thumbnail

Proterra introduces 35-foot electric bus

Green Car Congress

As a result, Washington State transit agencies and members of the Oregon Cooperative Purchasing Program (ORCPP) can now bypass future RFPs to purchase Proterra’s Catalyst through the region’s new innovative Master Contracts Usage Agreement (MCUA).

article thumbnail

US Geothermal Power Could Top 10 Gigawatts, New Industry Report Says

Green Car Congress

We hope the tax, loan guarantee, and DOE spending provisions of the stimulus bill will help turn this around, but there have been delays implementing these initiatives by the federal agencies. California. Mississippi. New Mexico. Washington. unspecified. The report found a total of 144 projects under development that could add between 4,699.9

Industry 240
article thumbnail

Coming Soon – The Electric City

Revenge of the Electric Car

Several thousand Leafs made in Japan will be delivered to metropolitan areas in California, Arizona, Washington state, Oregon and Tennessee. And in Oregon, an advisory group is working on charging stations and related issues. Nissan plans to build the Leaf in Tennessee eventually.).

article thumbnail

When Will EVs Hit Primetime?

Revenge of the Electric Car

To address the “range anxiety&# of prospective electric-car consumers in the US, a number of states, namely California, Oregon, and Hawaii, as well as private companies, are working to develop and install public charging stations on a large scale.

China 133