article thumbnail

Details on how Enbridge will expand capacity of Alberta Clipper oil sands crude pipeline without US review

Green Car Congress

million barrels per day of crude oil and liquids. The Enbridge Mainline system is the largest conduit of oil into the United States. Enbridge transports 53% of US-bound Canadian production, a figure that accounts for approximately 15% of total US crude oil imports. miles (2.4

Oil-Sands 339
article thumbnail

Canada and Alberta introduce joint plan for improved environmental monitoring in the oil sands

Green Car Congress

Proposed oil sands monitoring by 2015. The Government of Canada and Government of Alberta unveiled “The Joint Canada-Alberta Implementation Plan for Oil Sands Monitoring” in a partnership to improve environmental monitoring in the oil sands region with a program that will sample more sites for more substances more frequently.

Oil-Sands 274
article thumbnail

US BLM issues draft PEIS for oil shale and oil sands; significantly scales back public land available for commercial leasing

Green Car Congress

The US Bureau of Land Management (BLM) has published the Notice of Availability (NOA) of the Draft Programmatic Environmental Impact Statement (PEIS) and Possible Land Use Amendments for Allocation of Oil Shale and Tar Sands Resources on Lands Administered by the BLM in Colorado, Utah and Wyoming.

Oil-Sands 252
article thumbnail

Understanding the variability of GHG life cycle studies of oil sands production

Green Car Congress

In a paper published in the ACS journal Environmental Science & Technology , Stanford University assistant professor Adam Brandt reviews a number of recent life cycle assessment (LCA) studies calculating greenhouse gas (GHG) emissions from oil sands extraction, upgrading, and refining pathways—the results of which vary considerably.

Oil-Sands 225
article thumbnail

Canada introduces new integrated plan for oil sands monitoring

Green Car Congress

Summary of the current oil sands developments (mining and in-situ) and associated land use. Canada’s Environment Minister Peter Kent released an integrated monitoring plan for the oil sands region. fail in its goal of generating the data necessary to provide assurance that the oil sands are.

Oil-Sands 199
article thumbnail

Suncor Energy cancels Voyageur oil sands upgrader project; acquires Total’s stake

Green Car Congress

Suncor Energy is not proceeding with the Voyageur bitumen upgrader project in the Canadian oil sands. The decision is the result of a joint strategic and economic review launched by Suncor and its joint venture partner Total E&P Canada Ltd in late 2012. The transfer of interest for cash is effective immediately.

Oil-Sands 225
article thumbnail

Carbon Capture at Totals Joslyn Oil Sands Project Not Likely Until Around 2020

Green Car Congress

Total will not use carbon capture technology in the first phase of its Joslyn North Mine oil sands project, citing excessive cost. In 2009, the company suggested it was considering carbon capture and storage in its oil sands projects in Canada. In July, Total E&P Canada Ltd. Earlier post.).

Oil-Sands 231