Remove News Remove Oklahoma Remove Solar
article thumbnail

After Tesla snub, Oklahoma lands a 3 GW solar factory

Electrek

Enel North America has officially named Oklahoma as its choice for its 3-gigawatt (GW) solar panel and cell factory – the largest economic development project in the state’s history. more… The post After Tesla snub, Oklahoma lands a 3 GW solar factory appeared first on Electrek.

Oklahoma 137
article thumbnail

Oklahoma is about to get one of the largest solar cell factories in the US

Electrek

Enel North America has named Oklahoma as its preferred choice for its planned 3-gigawatt (GW) solar panel and cell factory. more… The post Oklahoma is about to get one of the largest solar cell factories in the US appeared first on Electrek.

Oklahoma 145
article thumbnail

The US’s largest battery-grade lithium refinery will be in Oklahoma

Baua Electric

Stardust Power , a lithium refiner supplying the EV sector, is going to build the US’s largest battery-grade lithium refinery in Oklahoma. The refinery will be in Southside Industrial Park in Muskogee, Oklahoma, southeast of Tulsa, and is expected to be capable of producing up to 50,000 metric tonnes of battery-grade lithium annually.

article thumbnail

A 147.5 MW wind farm is breaking ground in Oklahoma – a first for Avangrid

Baua Electric

Photo: Avangrid Orange, Connecticut-based clean energy giant Avangrid just made its first leap into Oklahoma with a new wind farm project. Avangrid, which is part of the Iberdrola Group, is setting up the Pontotoc Wind project in Pontotoc County, southeast of Oklahoma City. Get started here. – The post A 147.5

article thumbnail

Enel launches five new US wind, solar, and hybrid projects in three states

Electrek

Enel Green Power North America , headquartered in Andover, Massachusetts, has started construction on five new clean energy projects in the US. The new wind, solar, and hybrid projects announced today represent more than 1.5 gigawatts (GW) of new capacity and 319 megawatts (MW) of battery storage capacity.

Wind 133
article thumbnail

North America just got its first recycled Li-ion battery materials plant

Baua Electric

Within an existing recycling facility in Atoka, Oklahoma, the plant will produce sustainable, battery-grade cathode precursor, lithium, and anode materials – closing the EV recycling loop with the production done all in one plant. Get started here. –ad* ad* FTC: We use income earning auto affiliate links.

Li-ion 52
article thumbnail

Panasonic cools on idea for third US plant for Tesla batteries

Baua Electric

A third location was expected to be announced soon , and with it thousands of new jobs and the company pledging to raise its production capacity to 200 GWh by early 2031 from its current limit of 50 GWh. In December, the Japanese-owned electronics company turned down nearly $700 million in state incentives to build in Oklahoma.

IDEA 52