Remove Nashville Remove Stimulus Remove Transportation
article thumbnail

ECOtality installs first DC fast charger in Tennessee

Green Car Congress

The Tennessee Triangle,” a 425-mile stretch of interstate highway connecting Nashville, Knoxville and Chattanooga, is the preferred location for Cracker Barrel’s 12 DC Fast Chargers, which are suited for high-traffic commercial locations and major transportation corridors.

Tennessee 170
article thumbnail

Underwriters Laboratories Named Exclusive Nationally Recognized Testing Laboratory for The EV Project

Green Car Congress

The company signed a memorandum of understanding with Electric Transportation Engineering Corporation (eTec), a wholly owned subsidiary of ECOtality, Inc. to test and certify eTec’s vehicle charging stations that will be used in the project. Manufacturers work with UL to develop safer products and increase consumer confidence.

San Diego 186