Remove Manufacturer Remove Ohio Remove Parts
article thumbnail

Intel to invest $20B to build two processor factories in Ohio

Green Car Congress

Intel announced plans for an initial investment of more than $20 billion in the construction of two new leading-edge chip factories in Ohio. A rendering shows early plans for two new leading-edge Intel processor factories in Licking County, Ohio. Ohio will be home to Intel’s first new manufacturing site location in 40 years.

Ohio 435
article thumbnail

Honda opens new $124M wind tunnel in Ohio

Green Car Congress

Honda opened its new $124-million wind tunnel facility in Ohio, ushering in a new era of development testing capabilities for Honda and Acura products, as well as the company’s race vehicles. The new Honda Automotive Laboratories of Ohio (HALO) facility, located at the independent Transportation Research Center Inc. Investment.

Ohio 359
article thumbnail

Honda investing $700M in three Ohio plants to retool for EVs; with LG gigafactory, Ohio becomes Honda EV hub

Green Car Congress

Honda will invest $700 million to re-tool several of its existing auto and powertrain plants in Ohio for production of electric vehicles. Honda’s EV hub will leverage the company’s longstanding production, product development, and purchasing operations located in Central Ohio. Combined withe the $3.5-billion

Ohio 186
article thumbnail

LG Energy Solution and Honda break ground for new JV EV battery plant in Ohio

Green Car Congress

Honda and LG Energy Solution held the official groundbreaking ceremony for a new joint venture EV battery plant more than 2 million square feet in size, to be located in Fayette County, near Jeffersonville, Ohio—about 40 miles southwest of Columbus. Earlier post.) The two companies have committed to invest $3.5

Ohio 259
article thumbnail

Fisker and Foxconn confirm Fisker PEAR production in Ohio; expected base price below $29,900

Green Car Congress

recently acquired in Ohio from Lordstown Motors ( earlier post ). Fisker has designed and engineered the vehicle to reduce parts for rapid, simplified manufacturing. The Fisker PEAR will enter production in 2024. The Fisker PEAR will have an expected base price below $29,900 before incentives.

Fisker 259
article thumbnail

Honda Anna Engine Plant produces 30-millionth engine; retooling to add battery module casings production

Green Car Congress

Honda celebrated production of the 30-millionth engine built at the company’s Anna Engine Plant in Ohio with the production of the newly refined 2.0-liter liter Atkinson-cycle four-cylinder engine, which is part of the two-motor hybrid-electric system that powers Honda Accord and CR-V hybrid-electric models. Earlier post.)

Honda 305
article thumbnail

DOE awarding $75K to Cirba to expand battery recycling as part of $2.8B funding

Green Car Congress

billion to 21 projects to expand domestic manufacturing of batteries for electric vehicles (EVs) and the electrical grid and for materials and components currently imported from other countries. The US Department of Energy (DOE) is awarding a combined $2.8 Earlier post.)