article thumbnail

Sandia innovation eliminates reliance on rare-earth magnets for large-scale wind turbines

Green Car Congress

Motivated by the need to eliminate expensive rare-earth magnets in utility-scale direct-drive wind turbines, Sandia National Laboratories researchers have developed a fundamentally new type of rotary electrical contact. The technology proves beneficial in lowering costs, improving sustainability and reducing maintenance. 1 milliohm).

Wind 529
article thumbnail

bp and EnBW successful in ScotWind offshore wind bid; potential generating capacity of 2.9GW, up to £10B of investment

Green Car Congress

bp and EnBW have been awarded a lease option off the east coast of Scotland to develop a major offshore wind project to be known as Morven. The E1 lease is in an advantaged area, allowing the partners to develop it as a fixed-bottom offshore wind project with a total generating capacity of around 2.9

Wind 305
article thumbnail

IBM introduces new wind and solar forecasting system for utilities; big data analytics and weather modeling to predict output

Green Car Congress

The solution combines weather prediction and big data analytics to forecast accurately the availability of wind power and solar energy. By utilizing local weather forecasts, HyRef can predict the performance of each individual wind turbine and estimate the amount of generated renewable energy.

Wind 306
article thumbnail

MAN supplying mixed medium- and high-speed engines for hybrid foundation/wind turbine installation vessels

Green Car Congress

MAN Energy Solutions has won a fourth order to supply engines to Chinese shipbuilder, COSCO Heavy Industries, in Qidong for the construction of a second F-Class installation vessel used for the installation of offshore wind turbines and foundations. The previous three orders were for engines for two X-class and another F-class vessel.

Wind 259
article thumbnail

DOE awards up to $47M each to 3 offshore wind projects

Green Car Congress

The Energy Department selected three offshore wind demonstrations to receive up to $47 million each over the next four years to deploy innovative, grid-connected systems in federal and state waters by 2017. Principle Power will install five 6-megawatt direct-drive wind turbines approximately 18 miles off the coast of Coos Bay, Oregon.

Wind 210
article thumbnail

NTNU study finds ships’ and spare parts’ contribution to offshore wind power lifecycle impacts has been underestimated

Green Car Congress

Components: WT = wind turbine; Fnd = foundation; EC = electrical connections, including substation; Inst = installation; IOo = input-output, other; Mnt = Maintenance, excluding replacement parts; RP = replacement parts; EOL = end-of-life. ships and spare parts”—to the total life cycle impacts of offshore wind power.

Wind 199
article thumbnail

GE and Lake Erie Energy Development Corporation Establish Partnership; Great Lakes Offshore Wind Farm

Green Car Congress

GE and Lake Erie Energy Development Corporation ( LEEDCo ) of Northern Ohio have formed a long-term partnership beginning with the development of the first fresh water offshore wind farm in the US and involving a broad range of other initiatives.

Wind 210