Remove Installation Remove New Hampshire Remove Wind
article thumbnail

The US just proposed 18 GW of new offshore wind sales

Baua Electric

Hywind floating offshore wind turbine by U.S. The US announced two proposals for offshore wind sales that could generate more than 18 gigawatts (GW) of clean energy – enough to power more than 6 million homes. It’s the first in a five-year lease schedule that could see up to 12 separate offshore wind auctions.

Wind 52
article thumbnail

New England to become the second coal-free region in the US

Baua Electric

The Bow, New Hampshire-based power station has committed to retiring the coal-burning units at Merrimack and Schiller Stations in New Hampshire, by 2028 and 2025, respectively. That will make New Hampshire the 16th coal-free state. million tons of carbon emissions from New England. Get started here.

Coal 52
article thumbnail

An off-grid solar tracker powers this EV charging station

Baua Electric

Dartmouth College in Hanover, New Hampshire, has installed an off-grid solar tracker EV charging station for its employees. Designed for climate resilience, it sheds snow quickly, stows flat in high winds, and sits high enough to avoid flooding. What do you think of Solaflect’s Solar EV Charger? Get started here. –ad*

Grid 52
article thumbnail

NEESC releases 2015 hydrogen & fuel cell development plans for eight Northeastern states; power generation and transportation

Green Car Congress

Cumulative goals for the Northeast states include approximately 1,300 megawatts of installed stationary fuel cell capacity; 10,800 fuel cell electric vehicles; 640 fuel cell powered buses; and 110 hydrogen refueling stations to support the fuel cell electric vehicles and buses. New Hampshire. New Jersey. Earlier post.).

Hydrogen 150
article thumbnail

Solar Smackdown in Torrance – Installer Sues City on Behalf of the Sun

Creative Greenius

After a decade in the solar power installation business, Bradley Bartz is tired of being Mr. Nice Guy. He’s filed suit against Torrance, the proud home of Exxon/Mobil’s refinery, for stopping him from installing solar panels in the Hillside Overlay district. solar installers. For 10 days apparently. There is also.

Solar 210
article thumbnail

Road Test: 2024 Genesis Electrified GV70 AWD Prestige

Clean Fleet Report

Wind and road noise were low, reduced in-part by acoustic laminated glass and sound deadening insulation. Most owners will opt to install a 240V Level 2 charger at their home that will replenish the battery from 10-percent to 100-percent in about seven hours. There was limited body roll for a very comfortable ride.

article thumbnail

Toyota introduces 2012 Prius Plug-in Hybrid

Green Car Congress

The program will include a one-stop solution for home charging stations, installation services for 120V and 240V applications, and dedicated support for Toyota customers. The new model delivers extended EV range without sacrificing roominess for passengers or for luggage. inches of legroom that is on par with midsize sedans.

Prius 244