Remove Installation Remove Kits Remove Personal Remove Resource
article thumbnail

Electric vehicles and workplace charging for businesses research project

Drive Electric

1 of 20 Non Plastic Beach plastic free starter kits. Useful resources for fleets looking to make the switch. Any personal business data will be processed in accordance with the General Data Protection Regulation 2016 (GDPR).

article thumbnail

EV gateway

Electric Auto Association

For the Science Center, GEVA is an important resource when it comes to electric vehicles (EVs). I had to build a controller from a kit,” continued Garver, who was a member of the Electric Auto Association at that time. “It In 2013, he installed lithium batteries, and in 2017, he replaced the stalled-out DC motor with an AC version.

article thumbnail

EV gateway

Electric Auto Association

For the Science Center, GEVA is an important resource when it comes to electric vehicles (EVs). I had to build a controller from a kit,” continued Garver, who was a member of the Electric Auto Association at that time. “It In 2013, he installed lithium batteries, and in 2017, he replaced the stalled-out DC motor with an AC version.

article thumbnail

How to Get a Plug-In Hybrid

Tony Karrer Delicious EVdriven

Our goal is to enable owners to enlist a local electrician/engineer to convert their cars, initially with lead-acid batteries, for under $6,000 and less than two person-weeks of time. (We is Hymotions San Francisco-based distributor/installer. Pricing from $8-15,000 for installed low-speed EV range of 8-24 miles.

Plug-in 41
article thumbnail

Take part in our EV fleet survey

Drive Electric

1 of 20 Non Plastic Beach plastic free starter kits. Useful resources for fleets looking to make the switch. Any personal business data will be processed in accordance with the General Data Protection Regulation 2016 (GDPR). Meet the Netx 3-socket charger.

Fleet 52
article thumbnail

Xerox Parc’s Engineers on How They Invented the Future—and How Xerox Lost It

Cars That Think

Networks that link personal computers in offices. A later version of that tester, based on an Alto personal computer, also developed at PARC, ended up being used by Intel itself on its production line. If it was a personal computer, you had to be able to build 100.” Colorful weather maps on TV news programs. Laser printers.

Future 145
article thumbnail

Solar Powered Greenius Producing Massive South Bay Energy

Creative Greenius

I continue to be an aspiring policy wonk on the solar financing issue known around the state as AB 811 financing, since we need it if we’re going to make it possible for people to install solar right now, instead of waiting till electric rates triple and the greenhouse gas situation makes it mandatory.

Solar 170