Remove Installation Remove International Remove Lebanon
article thumbnail

ECOtality installs first DC fast charger in Tennessee

Green Car Congress

ECOtality and Cracker Barrel Old Country Store unveiled the first Blink Direct Current (DC) Fast Charger in Tennessee at the Lebanon Cracker Barrel location. This is the first of 12 Cracker Barrel locations statewide that will install DC Fast Chargers as a part of The EV Project.

Tennessee 170
article thumbnail

President Obama Announces 48 Projects to Receive $2.4B in Grants for Next-Generation of Batteries and Electric Vehicles; To be Combined with $2.4B in Industry Cost-Share

Green Car Congress

Holland, MI Lebanon, OR (Entek). Exide Technologies with Axion Power International. Honeywell International Inc. Companies and universities in Michigan are receiving more than $1 billion of the grants. DOE Award ($mil.). Project locations. Technology. Johnson Controls. A123 Systems, Inc. Bristol, TN Columbus, GA. Elyria, OH.

article thumbnail

Biden: U.S. electric car charging pile factory will have a “ripple effect”

Setec Powerr

The factory, located in Lebanon, east of Nashville, Tennessee, is expected to produce as many as 30,000 electric vehicle chargers a year and create 500 jobs, the White House said. The federal government plans to designate installation routes along the interstate highway system for drivers to use charging stations. The U.S.

article thumbnail

Risen from the dead! Honda-Nissan merger reanimates with both still keen to join forces to fund future EV and next-gen tech

EV Central

But that would only happen with a new Nissan boss installed who is more willing to “manage internal opposition. might be wary of installing a westerner when Carlos Ghosns time as boss ended with him under arrest, then escaping and now on the run in Lebanon.

Honda 98