Remove Grant Remove Installation Remove Stimulus
article thumbnail

South Bay Bicycle Coalition Scores $240,000 Grant! Huge Grassroots Victory for Brand New Bike Group

Creative Greenius

South Bay Bicycle Coalition members including Redondo Beach Councilman Steve Diels, with County Supervisor Mark Ridley Thomas and County Department of Public Health Staff upon awarding of the grant. The group hopes to see more South Bay cities install such bicycle-friendly facilities. Steve McCrank, Daily Breeze Staff Photographer).

Grant 350
article thumbnail

ECOtality installs first DC fast charger in Tennessee

Green Car Congress

This is the first of 12 Cracker Barrel locations statewide that will install DC Fast Chargers as a part of The EV Project. The project is a public-private partnership, funded in part by the US Department of Energy through a federal stimulus grant and made possible by the American Recovery and Reinvestment Act (ARRA).

Tennessee 170
article thumbnail

DOE to Award Up to $300M in Stimulus Bill Funding for Projects to Expand Use of Alt-Fuel and Advanced Technology Vehicles

Green Car Congress

The installation or acquisition of infrastructure necessary to directly support an alternative fueled vehicle or advanced technology vehicle is also eligible. The grant program may provide up to 30 geographically dispersed project grants, with a ceiling of $15,000,000 and a floor of $5,000,000.

Stimulus 150
article thumbnail

Oregon opens first phase of West Coast Electric Highway

Green Car Congress

Spaced at roughly 25-mile intervals along the southern Oregon I-5, the AeroVironment charging stations are available at locations in Cottage Grove, Rice Hill, Roseburg, Canyonville, Wolf Creek, Grants Pass, Central Point, and Ashland. Each location has two charging stations including one DC fast charger.

Oregon 231
article thumbnail

ECOtality to Provide Blink EV Charging Stations at Select US Best Buy Stores

Green Car Congress

Under the terms of the agreement, the Level 2, J1772-compliant charging stations will be installed at 12 Best Buy stores in Tucson, Ariz.; Charging stations at these stores, within pilot markets of The EV Project, will be installed by March 2011. Phoenix, Ariz.; Los Angeles, Calif.; San Diego, Calif. and Seattle, Wash.

Store 218
article thumbnail

CleanFUEL USA Introduces New Liquid Propane Injection System for GM 6.0L Engine

Green Car Congress

The new engine system will be available the first quarter of 2010 and the company is now taking orders to meet the increased demand for greener fleet vehicles, as the Department of Energy (DOE) starts to award stimulus funds this December. Systems are available through CleanFUEL USA Master Dealers and Preferred Installers.

USA 199
article thumbnail

CleanFUEL USA Secures $12.9 Million from US DOE for 100+ Propane Refueling Stations

Green Car Congress

million in two stimulus grants to CleanFUEL USA to establish more than 100 liquid propane (autogas) refueling stations in major US cities in coordination with CleanFUEL USA partners, including ConocoPhillips. The first station will be installed in Atlanta followed by Chicago, Houston, Denver and Sacramento.

USA 218