article thumbnail

LEAF sales hit 50K mark in US, almost 115K worldwide

Green Car Congress

So far in 2014, LEAF sales in the Dallas-Fort Worth metroplex have grown by about 50% over the previous year, with that growth set to accelerate faster thanks in part to the introduction of a new state tax rebate of up to $2,500 on the purchase or lease of a new Nissan LEAF.

article thumbnail

Aurora releases Aurora Driver Beta 2.0

Green Car Congress

New commercial route between Fort Worth and El Paso supported by daily map updates. New commercial route with enhanced mapping for daily maintenance. includes several advances that enhance its ability to operate on long-haul routes such as Fort Worth to El Paso. The Aurora Driver 2.0 Aurora Driver Beta 2.0

El Paso 259
article thumbnail

City of Ann Arbor Receives Four Hydraulic Hybrid Recycling Trucks; 30% Reduction in Fuel Consumption and Emissions

Green Car Congress

The four trucks, based on the Peterbilt Model 320 Hybrid with Labrie body, will operate in daily curbside recycling duty and are expected to provide up to 30% improvements in fuel economy and emissions and significant reductions maintenance costs. Testing has shown a significant improvement in maintenance costs. Click to enlarge.

article thumbnail

GE unveils prototype for first Tier 4 heavy-haul locomotive

Green Car Congress

GE gathered inputs from its North American Class I railroad customers concerning safety, reliability, fuel usage and operational needs, and then partnered with its operations and maintenance teams to test the new design’s real-world functionality.

article thumbnail

LG opens new EV charger factory in Fort Worth, Texas – Charged EVs

Baua Electric

A ribbon-cutting ceremony for the Fort Worth facility was attended by the city’s mayor and other officials. LG already has a huge distribution center for consumer electronics and home appliances in Fort Worth. The first products assembled in Fort Worth, starting this month, will be Level 2 AC chargers.

article thumbnail

LG opens its first EV charging equipment factory in the U.S.

Teslarati

According to a press release shared by the company on Monday, LG has opened the EV charger plant in Fort Worth, Texas, set to eventually have an annual capacity of over 10,000 units. The news also came alongside a ribbon-cutting event featuring LG executives, Fort Worth Mayor Mattie Parker, and other local officials.

article thumbnail

Clean Energy wins $10M, multi-year transit deal with New Jersey Transit

Green Car Congress

The procurement includes rebuilding a large compressed natural gas (CNG) fueling station, as well as additional garage modifications and the repair and maintenance of facilities through 2020. Clean Energy extended its maintenance contract with Santa Cruz Metropolitan Transit District (Santa Cruz Metro) for an additional 5 years.