Remove Energy Storage Remove Nevada Remove Supplies
article thumbnail

DOE awarding $1.6B to 11 battery materials separation and processing projects as part of $2.8B funding

Green Car Congress

billion will go to 11 projects in the materials separation and processing segment of the supply chain. Anovion , Scaling the Domestic, US Owned and Operated Anode Supply Chain for Synthetic Graphite, $117,000,000. It will produce enough material to supply more than 250,000 electric vehicles annually. Of that, $1.6

Parts 459
article thumbnail

Tesla Gigafactory Nevada employees celebrate 1,000,000th battery pack built at plant

Teslarati

Tesla Gigafactory Nevada employees have built the 1,000,000th battery pack produced at the plant. Employees at the Sparks, Nevada facility have each signed the commemorative pack, recognizing their hard work has officially resulted in one heck of a milestone for Tesla as a whole and each worker involved on production lines.

Nevada 144
article thumbnail

4 companies jointly propose $8B green energy initiative for LA area; Wyoming wind, Utah storage, transmission

Green Car Congress

Four companies—Pathfinder Renewable Wind Energy, Magnum Energy, Dresser-Rand and Duke-American Transmission—have proposed a first-in-the-US, $8-billion green energy initiative that would bring large amounts of clean electricity to the Los Angeles area by 2023. million megawatt-hours per year vs. 3.9

Utah 261
article thumbnail

Blue Bird premieres next-generation electric school bus; more range, faster charging, increased seating; Cummins Accelera powertrain

Green Car Congress

The zero-emission vehicle will be on display for the first time from 14-19 July 2023, inside the Peppermill Resort in Reno, Nevada. An improved engineering design and internally insulated batteries limit the heat loss in the vehicle’s next-generation energy storage system.

Range 370
article thumbnail

CATL reaches deal to supply energy storage systems to US firm HGP

CN EV Post

The 450-MWh battery storage project will be deployed in Texas and is expected to begin commercial operations in 2024. Image credit: CATL ) CATL recently entered into a 450 MWh supply agreement with US battery storage project developer HGP, the battery giant's latest similar agreement with a US company.

article thumbnail

Redwood Materials To Supply Cathode Materials To New Panasonic Battery Factory

CleanTechnica EVs

Panasonic has agreed to purchase cathode materials and copper foil from Redwood Materials for its battery factories in Nevada and Kansas.

Kansas 130
article thumbnail

ARPA-E awards $130M to 66 “OPEN 2012” transformational energy technology projects

Green Car Congress

Electron Energy Corporation will develop a technology to. would supply the growing market of wind turbine generators and. ARPA-E OPEN 2012 selections: Transportation Energy Storage. that could improve the amount of energy storage allowing an. energy storage device for hybrid electric vehicles that combines.

2012 240