Remove DC Remove Grant Remove Plug Remove Tucson
article thumbnail

BP to Install 45 Ecotality Blink DC Fast Charging Stations

Green Car Congress

a partner in The EV Project, will install ECOtality’s Blink electric vehicle (EV) DC Fast Chargers (480 volt 3-Phase AC input)—unveiled at the Business of Plugging In 2010 conference—at 45 BP and ARCO locations. Blink DC Fast Chargers will be available to the public at BP and ARCO locations as early as March of 2011.

DC 210
article thumbnail

USDOT announces $84.9M through Lo-No program to expand advanced bus technologies

Green Car Congress

million in grant selections through the Low- or No-Emission (Low-No) Grant program, which funds the deployment of transit buses and infrastructure that use advanced propulsion technologies. City of Tucson. The US Department of Transportation’s (USDOT) Federal Transit Administration (FTA) announced $84.9 2,600,000. 1,660,180.

Tulsa 170
article thumbnail

ECOtality to Provide Blink EV Charging Stations at Select US Best Buy Stores

Green Car Congress

Under the terms of the agreement, the Level 2, J1772-compliant charging stations will be installed at 12 Best Buy stores in Tucson, Ariz.; Separately, ECOtality said that it will unveil its commercial DC Fast Charging station at the upcoming Business of Plugging In 2010 conference. ECOtality, Inc. Phoenix, Ariz.;

Store 218
article thumbnail

President Obama Announces 48 Projects to Receive $2.4B in Grants for Next-Generation of Batteries and Electric Vehicles; To be Combined with $2.4B in Industry Cost-Share

Green Car Congress

billion in grants to US-based manufacturers to produce batteries and their components and to expand battery recycling capacity; $500 million in grants to US-based manufacturers to produce electric drive components for vehicles, including electric motors, power electronics, and other drive train components; and. Technology.

Grant 317
article thumbnail

Underwriters Laboratories Named Exclusive Nationally Recognized Testing Laboratory for The EV Project

Green Car Congress

The EV Project began in October 2009 when ECOtality’s eTec was awarded a federal stimulus grant of nearly $100 million from the DOE, and will deploy 4,700 Nissan LEAF EVs for the three-year study. These standards and requirements are used to assess the safety of the overall charging systems and interoperability of its components.

San Diego 186
article thumbnail

"Spirit" Due to Link Up with Tucson EVA2 along with Tesla Roadtrip'sters at Bookmans Grand Celebration at Grant & Campell, 9-12:00AM, Sat, 19 Dec 09

Spirit of DC - PHEV3A

Before going quite quiet for the holidays, the "Spirit of DC" will be linking up with the Tucson Electric Vehicle Association 2 for its normal third Saturday meeting, however, it's at Bookmans for its Grand Charging Station Celebration. Date Destination Miles December 17 Palm Springs 140 December 18 Phoenix 250 December 19 Tucson 121

Tucson 36
article thumbnail

"Spirit" Back at Home Sweet Bisbee But With Safford in Graham Cty and Clifford in Greenlee Cty as well as Bookmans in Mind

Spirit of DC - PHEV3A

The "Spirit" is all charged up, but it's not quite the same for EVJerr, except mentally where it comes to next "Plug-in Arizona" EVentures. Also, definitely in mind is a Tucson return to Bookmans for the Grand Opening of its Charging Station on Saturday morn, 19 December 2009. Grant Road. Tags: Bookmans in Tucson.

Tucson 40