Petrobras starts production from South America’s first tension leg wellhead platform
Green Car Congress
MARCH 17, 2015
Thirteen production wells will be connected to the P-61, and the well currently in operation is the PPT-16. Shuttle tankers transport the oil from the field and surplus gas not consumed on the platforms is injected into a nearby reservoir. The topside of P-61 was built at the Keppel Felds shipyard in Singapore. dry tree”.
Let's personalize your content