Remove Commercial Remove Parts Remove Wichita
article thumbnail

NASA awards $16.5M to four teams for additional research into reducing aircraft fuel consumption, emissions and noise

Green Car Congress

Cessna Aircraft Company-Cessna Citation, Wichita, Kan., The Boeing subsonic team, which includes BR&T, Boeing Commercial Airplanes, General Electric and Georgia Tech, looked at five concepts as part of the SUGAR (Subsonic Ultra Green Aircraft Research) project. Massachusetts Institute of Technology (MIT), Cambridge, Mass.,

Emissions 199
article thumbnail

4 Takeaways About Boeing’s Quality Problems

Baua Electric

Boeing said it did not allow inspector shopping and had increased the number of quality inspectors for commercial planes 20 percent since 2019. Boeing’s suppliers, facing similar problems, have also had trouble producing parts at the rate that Boeing wanted them. The company is facing heightened scrutiny. Since Jan.

Wichita 52
article thumbnail

Boeing Says Added Inspections Are Raising 737 Max Production Quality

Baua Electric

The body is made in Wichita, Kan., Lund, the senior vice president for quality in Boeing’s commercial airplane division. We’ve strengthened our presence at the supplier, we ensure the parts are perfect where they ship, we inspect them there, they rework them there, and then we ship the parts,” Ms.

article thumbnail

Boeing Angers Safety Officials With Disclosures on 737 Max Incident

Baua Electric

Lund was promoted as part of a leadership shake-up in February , taking on her current role as a senior vice president overseeing quality across all of Boeing’s commercial airplanes. She was most recently in charge of commercial plane production programs. The body is made in Wichita, Kan.,

Alaska 52
article thumbnail

Boeing Agrees to Buy Spirit AeroSystems, a Longtime Supplier

Baua Electric

Boeing said on Monday that it had agreed to buy a major supplier, Spirit AeroSystems, ending a nearly two-decade experiment in outsourcing production of major components of its commercial planes, including the body of the 737 Max and parts of the 767, 777 and 787. The deal, which was widely expected, was valued at $4.7

Buy 52
article thumbnail

‘Shortcuts Everywhere’: How Boeing Favored Speed Over Quality

Baua Electric

And some suppliers have struggled to adhere to quality standards while producing parts at the pace Boeing wanted them. The chief executive, Dave Calhoun, will leave at the end of the year, and Stan Deal, the head of the commercial planes division, which makes the 737 Max, retired immediately. After the Jan.

article thumbnail

Boeing Reinstalled Panel That Later Blew Out of 737 Max Jet

Baua Electric

The employees opened the panel, known as a door plug, because work needed to be done to its rivets — which are often used to join and secure parts on planes — said the person, who asked for anonymity because the person isn’t authorized to speak publicly while the National Transportation Safety Board conducts an investigation.

Wichita 52