Remove Commercial Remove Connected Remove Electric Vehicles Remove Grid
article thumbnail

California Adopts Nation’s First Deadlines for Utilities to Connect EV Chargers to the Grid

CleanTechnica EVs

The California Public Utilities Commission approved a new set of timelines to accelerate the connection of new residential buildings, commercial businesses, and electric. continued] The post California Adopts Nation’s First Deadlines for Utilities to Connect EV Chargers to the Grid appeared first on CleanTechnica.

Grid 107
article thumbnail

Pecan Street launches Texas’ first grid-connected vehicle-to-grid research and testing center

Green Car Congress

launched Texas’ first grid-tied vehicle-to-grid (V2G) testing center at its lab in Austin, turning electric vehicles into a dispatchable load shaving tool for the municipally-owned electric utility, Austin Energy. New grid-tied V2G equipment installed at Pecan Street’s lab in Austin, TX.

Grid 352
article thumbnail

ABI Research: connected services for consumer and commercial EVs to reach US$378M in revenues by 2030

Green Car Congress

Subscriptions of connected services for consumer and commercial Electric Vehicles (EVs), such as charging-station locator, eco-routing, and EV telematics, will grow 270% from 2020 to 2024, reaching 7 million subscribers by 2024, according to global tech market advisory firm, ABI Research.

Connected 191
article thumbnail

GM launches GM Energy business unit with Ultium Home, Ultium Commercial

Green Car Congress

General Motors introduced Ultium Home and Ultium Commercial, which in combination with the existing Ultium Charge 360, create an ecosystem of energy management products and services that will be housed under a new business unit called GM Energy.

GM 330
article thumbnail

IPG to demo Flameless Ceramic Turbine for clean, off-grid power in EV charging

Green Car Congress

Intelligent Power Generation (IPG) will demonstrate the impact of Flameless Ceramic Turbine technology in UK electric vehicle (EV) charging infrastructure, following a £1-million contract from Highways England. This growth will require high megawatt capacities across England’s road networks.

Grid 435
article thumbnail

Grid connection considerations for DC fast charging infrastructure

Setec Powerr

DC chargers provide a higher amount of power to electric vehicles, hence requiring more from the grid. To ensure the grid can meet your demands, you’ll need to evaluate the expected EV traffic and their charging behaviors, such as peak charging times and duration of charges. Is There Local Grid Supply Competition?

DC 52
article thumbnail

Volta/Imogen collaboration awarded $12M in ARPA-E funding to commercialize next-generation fast charging technology

Green Car Congress

Volta, an electric vehicle (EV) charging and media company, announced that a project application it collaborated on with Imagen Energy, a developer of compact high-power EV chargers, was awarded a $12-million grant from the US Department of Energy Advanced Research Projects Agency-Energy (ARPA-E). Earlier post.).