ExxonMobil brings Kearl oil sands expansion online ahead of schedule; overall capacity doubling to 220K barrels per day
Green Car Congress
JUNE 17, 2015
The PFT process removes a portion of the heavy end of the barrel (asphaltenes) using less energy than would be required to remove the same heavy ends in a coker at an on-site upgrader, thus reducing greenhouse gas emissions. Energy needs are further reduced through the installation of energy-saving cogeneration facilities.
Let's personalize your content