Remove Building Remove Miami Remove Miles
article thumbnail

Proterra and Miami-Dade County announce major EV technology project for fleet electrification; 42 more electric buses, 75 chargers

Green Car Congress

Proterra Inc and Miami-Dade County announced a major fleet electrification project with the County acquiring 42 Proterra ZX5+ electric transit buses, featuring a total of 19 MWh of battery storage capacity, along with plans to install 75 Proterra chargers across three bus depots. The first electric buses are slated to be delivered in 2022.

Miami 284
article thumbnail

Elon Musk’s Boring Company submits plans for 6.2-mile Loop system in Miami

Teslarati

As per a recent report, The Boring Company has submitted a proposal to build the North Miami Beach Loop, a 6.2-mile mile transport tunnel system in Miami, FL. When scaled, the North Miami Beach Loop could be scaled to accomodate over 15,000 commuters per hour. Traditional solutions that span 6.2

Miami 136
article thumbnail

Boring Company gets another potential FL project in North Miami Beach

Teslarati

North Miami Beach Vice Mayor Michael Joseph has initiated talks with Elon Musk’s Boring Company for a one to two-mile tunnel under State Road 826. In late February, the Vice Mayor tagged Elon Musk and The Boring Company (TBC) in a tweet, asking the billionaire and his tunneling company to consider a North Miami Beach project.

Miami 131
article thumbnail

Ford, Argo AI, and Walmart to launch autonomous vehicle delivery service in three US cities

Green Car Congress

Ford Motor Company, Argo AI and Walmart are working together to launch an autonomous vehicle delivery service in Miami; Austin, Texas; and Washington, DC—Walmart’s first multi-city autonomous delivery collaboration in the US. Argo and Ford have been operating in Miami and Washington, D.C.,

Miami 186
article thumbnail

Electrify America to install 2,800 charging stations at workplaces and multi-unit dwellings across US

Green Car Congress

Level 2 charging will provide for a charging speed up to 20-25 miles of driving range per hour, which would allow drivers to fully charge their electric vehicles at their home or workplace.

article thumbnail

The Boring Company to connect Brightline to Fort Lauderdale Beach in 3 mins

Teslarati

The Boring Company’s (TBC) unsolicited proposal to Fort Lauderdale for a Las Olas Loop was recently made public, revealing some more details about the Miami tunnel project. As per The Next Miami (TNM) , TBC proposed a tunnel system that would bring passengers from Fort Lauderdale to the beach in 3 minutes.

Connect 115
article thumbnail

First $300M tranche of VW National ZEV investment targets charging infrastructure; 150kW+ fast charging on highway network

Green Car Congress

Chicago, Portland, Boston, Seattle, Philadelphia, Denver, Houston, Miami, and Raleigh—and several highway corridors. Electrify America plans to build charging infrastructure that will primarily consist of (1) community charging and (2) a long-distance highway network. personnel, other business expenses).

Charging 150