Remove Building Remove Installation Remove St. Louis
article thumbnail

DOE awarding $1.16B to 9 battery component manufacturing projects as part of $2.8B funding

Green Car Congress

Group14 intends to build two 2,000 ton per year commercial manufacturing modules. These funds will support the build-out of a 600,000 sq ft factory housed in Moses Lake, Washington, that will produce lithium-ion anode materials. The plant will be an expansion of its existing facility in St. ICL-IP America Inc.

article thumbnail

Volvo Trucks Customer QCD orders 30 more VNR Electric trucks for Southern California fleet

Green Car Congress

To bolster the environmental and economic benefits of the project further, as well as increase resiliency, QCD has partnered with Scale Microgrid Solutions to build a clean energy microgrid to power its La Puente’s battery-electric fleet and distribution center. Located in the St.

Volvo 273
article thumbnail

DOE awarding $1.16B to 9 battery component manufacturing projects as part of $2.8B funding

Green Car Congress

Group14 intends to build two 2,000 ton per year commercial manufacturing modules. These funds will support the build-out of a 600,000 sq ft factory housed in Moses Lake, Washington, that will produce lithium-ion anode materials. The plant will be an expansion of its existing facility in St. ICL-IP America Inc.

article thumbnail

Electrify America, Walmart complete >120 ultra-fast charging stations at Walmart Stores

Green Car Congress

Building upon the original commitment set forth in April 2018, the companies are planning to expand the relationship in the coming years with additional Electrify America charging stations located at Walmart stores across the country. Electrify America chargers at Walmart stores feature 150 kilowatt (kW) and 350kW DC Fast Chargers.

Store 236
article thumbnail

Junkyard Find: 1972 Ford Econoline "BIG CHEESE"

The Truth About Cars

Perhaps it started out in St. Louis or Salt Lake City and moved to Colorado after its delivery days were over. The build tag says it was built at the Lorain plant in Ohio. Naturally, someone has installed tube headers on the engine. Some comfortable captain-style seats have been installed up front.

Ford 97
article thumbnail

EV gateway

Electric Auto Association

Louis chapter spreads the message locally. Caravan of GEVA EVs leave the Saint Louis Science Center McDonnell Planetarium. The Gateway Electric Vehicle Association (GEVA) has forged partnerships in the St. Louis area that have proved successful in expanding outreach. Wayne Garver with his 1971 VW conversion. “I

article thumbnail

Yes, Automakers Stand To Benefit From Installing Public EV Charging Stations

EV Connect

That’s how Tesla charged to a massive head start — simply by putting as much effort and resources into building its charging network as it did into making its cars. Installing public, open EV charging stations makes widespread adoption possible. Luke Daugherty is a freelance writer, editor and former operations manager based in St.