Remove Building Remove Cost Of Remove Greece Remove International
article thumbnail

DOE awards $4M to carbon capture and storage projects selected as part of ACT

Green Car Congress

The US Department of Energy’s (DOE) Office of Fossil Energy (FE) announced $4 million in federal funding for national laboratories to collaborate with international partners on seven projects out of the 12 that were selected as a part of the Accelerating Carbon Capture and Storage Technologies (ACT) Initiative.

Carbon 150
article thumbnail

Europe Expands Virtual Borders To Thwart Migrants

Cars That Think

By delivering the migrants there, the masters of the Maltese vessels, and perhaps the European rescue authorities involved, may have violated the international law of the sea, which requires ship masters to return people they rescue to a safe port. billion) a year internally on managing migration, not counting national-level spending.

Europe 138
article thumbnail

Powering Offshore Wind Farms With Numerical Modeling of Subsea Cables

Cars That Think

Before fixing or installing a submarine cable, which can cost billions of dollars, cable designers have to ensure that designs will perform as intended in undersea conditions. Losses The conductor size of a subsea or terrestrial cable affects the cost of the cable system. This is often a crucial aspect of an offshore wind farm project.

Wind 67
article thumbnail

Canoo Pickup, Kia EV6, Honda and Mini EV Plans: EV Week in Review – Mar 9-15

EV Adoption

Mullen will also spend about $26 million renovating the building at the site, which was formerly inhabited by Nike but has been vacant for the past five years. LG suggests building EV battery factory in Georgia, report says – LG Energy Solution suggested that it could build a factory in the U.S. LG to invest $4.5

Kia 52
article thumbnail

MIT study cautions smaller nations on rushing to develop their natural gas resources; Cyprus as model

Green Car Congress

Common generic outputs from DCF analysis include net present value (NPV) and internal rate of return (IRR). Input parameters include the project’s capital costs, its operating costs, the plant’s fuel loss factor, and the plant’s utilization rate. The capital cost of the LNG plant was set at $1,200/tonne of nameplate capacity.

Cyprus 261