Remove Bright Works Remove Parts Remove Supplies
article thumbnail

BMW Group opens new automated steel pressing facility at Swindon plant

Green Car Congress

The new press is made up of six individual stations which can produce up to 18 parts per minute—more than twice the capacity of the previous press line. The building has numerous environmental features including water harvesting from the roof to provide water to all non-drinking water supplies.

BMW 259
article thumbnail

Maximising self-consumption through pioneering green tech

My Energi

While all myenergi products can work autonomously, they also work collaboratively as part of a connected ecosystem. Harnessing the opportunity As demand for solar power continues, the future of the technology looks impressively bright.

Green 52