Remove Bright Works Remove Manufacturer Remove Supplies
article thumbnail

BMW Group opens new automated steel pressing facility at Swindon plant

Green Car Congress

This is a technological first for the BMW Group and is will be rolled out in other press shops around the company’s global network of manufacturing plant. The building has numerous environmental features including water harvesting from the roof to provide water to all non-drinking water supplies.

BMW 259
article thumbnail

Maximising self-consumption through pioneering green tech

My Energi

Alongside zappi, we also manufacture a wide range of other devices – such as eddi, the UK’s #1 solar power diverter, which diverts surplus renewable energy to domestic heating systems; and harvi, an energy monitoring wireless sensor that allows the zappi and eddi to be installed without wiring a direct CT clamp.

Green 52