Remove Boston Consulting Group Remove Store Remove Think City
article thumbnail

A More Detailed Look at a Prismatic Li-ion Cell and Pack Manufacturing Process

Green Car Congress

EnerDel is scheduled to ship its first cells and packs for the Think City EV on 1 March 2010. The lithium-ion version of the THINK vehicle will have 384 cells in its 25 kWh battery pack and a range of more than 100 miles. The active materials are defined by the cell chemistry.

Li-ion 218