We visited the OLA Future Factory: Electric Scooter Manufacturing
Plug In India
MAY 3, 2022
I met with Preeti Gupta, a freelancer with the BBC. So energy storage of pack is 57.6 * 80 = 4.6 Rejection at a later stage is expensive, as the full charge -discharge test takes 8 hours per pack, and consumes a lot of energy. The burnt air is filtered and the hot air is supplied to the paint oven at 100 degree Celsius.
Let's personalize your content