Remove Available Remove Charging Remove Fresno Remove Installation
article thumbnail

Up to $29M available for public EV chargers in SoCal; SCIP accepting applications

Green Car Congress

A rebate project to increase public access to high-powered charging stations for plug-in electric vehicles (EVs) throughout Southern California launched this week in Los Angeles, Orange, Riverside and San Bernardino counties. Rebates of up to $80,000, or 80% of total costs, are available in designated disadvantaged communities.

Available 210
article thumbnail

Project to award up to $15.5M in rebates for EV chargers in Sacramento County

Green Car Congress

million in funds available for qualifying local businesses and nonprofit organizations. The rebates will be available through the Sacramento County Incentive Project to install both commercial-grade Level 2 chargers and high-powered DC fast chargers. Rebates for Level 2 chargers are up to $6,000 per connector.

article thumbnail

Electrify America opening first California EV fast charging station in Torrance; targeting 9 in California by year-end

Green Car Congress

The Country Hills Shopping Plaza in Torrance, California will be the site of the first DC fast charging station to open in the state as part of Electrify America’s plan to install approximately 160 charging stations in California by June 2019. Montebello Plaza, 2401 W. Via Campo, Montebello, CA. Elk Grove, CA. Novato, CA.

article thumbnail

WattEV opens US’ first megawatt charge station with 1.2MW speeds and solar

Baua Electric

WattEV has just opened the first electric truck charging depot in the US to use the new Megawatt Charge System, capable of delivering up to 1.2 megawatts of power, currently the highest-speed charger available in the US, along with solar and battery backup on-site and a unique partially grid-islanded setup.

Solar 52
article thumbnail

Lightning Systems battery-electric heavy-duty Ford Transit showing 61 MPGe city, 66 MPGe highway

Green Car Congress

The all-electric Lightning product features a liquid-cooled Li-ion battery from a volume-ready world-class battery supplier that can be fast-charged in 30 minutes on DC fast charging and in six hours with Level 2 charging. LightningElectric is available for the Ford Transit as part of Ford’s eQVM program.

Ford 257
article thumbnail

CARB approves Electrify America’s second $200M investment in California

Green Car Congress

Partial Consent Decree, CARB moved forward the company’s plans for DC fast-charging in more metro areas, adding charging for regional routes, and strengthening highway networks. The company also will invest in rural Level 2 charging. In Cycle 2, Electrify America also will continue to invest in the six Cycle 1 metros: Fresno.

article thumbnail

BMW i and EVgo expanding ChargeNow DC Fast program; 500 more fast chargers in US; no-cost DC and Level 2 for BMW i3 drivers

Green Car Congress

As part of its ongoing commitment to the growth of a robust public DC Fast charging infrastructure, BMW is supporting EVgo’s installation of an incremental 500 DC Fast Combo chargers, to benefit BMW i3 customers and all EV drivers in the US with DC Fast Combo charging capability.

DC 150