Remove Available Remove Charging Remove Fresno Remove Grid
article thumbnail

Electrify America launches 8 solar-powered EV charging stations in rural Fresno County

Green Car Congress

Electrify America (EA), the largest open DC fast charging network in the US, is increasing access to sustainable electric vehicle (EV) infrastructure for rural Californians with the deployment of eight new solar-powered, off-grid charging stations across Fresno County. Indianola Ave/E. Jensen Ave, Sanger, CA 93657.

Fresno 459
article thumbnail

WattEV opens US’ first megawatt charge station with 1.2MW speeds and solar

Baua Electric

WattEV has just opened the first electric truck charging depot in the US to use the new Megawatt Charge System, capable of delivering up to 1.2 megawatts of power, currently the highest-speed charger available in the US, along with solar and battery backup on-site and a unique partially grid-islanded setup.

Solar 52
article thumbnail

CARB approves Electrify America’s second $200M investment in California

Green Car Congress

Partial Consent Decree, CARB moved forward the company’s plans for DC fast-charging in more metro areas, adding charging for regional routes, and strengthening highway networks. The company also will invest in rural Level 2 charging. In Cycle 2, Electrify America also will continue to invest in the six Cycle 1 metros: Fresno.

article thumbnail

Electrify America announces $200M Cycle 2 zero emission vehicle investment plan for California

Green Car Congress

The second cycle investment will build on Electrify America’s initial priorities and expand into new areas, where the need for electric vehicle charging stations and technology are greatest or are most likely to be used regularly. Electrify America also will continue to invest in the six Cycle 1 metros: Fresno. San Diego-Carlsbad.

America 239
article thumbnail

Fresno County unveils countywide solar-powered EV charging program using Envision Solar’s EV ARC

Green Car Congress

This is the largest single deployment of solar-powered electric vehicle charging stations in the County and the first to link all the rural cities in one single county. The EV ARC products will provide no-cost charging for San Joaquin Valley EV drivers, helping to make electric cars more affordable for Fresno County residents.

Fresno 170
article thumbnail

CARB draft of updated AB 32 Scoping Plan for climate change actions post-2020; pushing for greater transportation reductions

Green Car Congress

This level of reduction can also continue beyond the current rulemaking, and an additional 5% annual improvement through 2025 or 2030 is feasible and cost-effective, ARB asserts, by using commercially available technologies and advanced transmissions, hybridization, improved trailer aerodynamics, and other technologies.

article thumbnail

Cleantech Blog: Smart Grids and Electric Vehicles

Tony Karrer Delicious EVdriven

Intelligent Charging Infrastructure for New Electr. Vehicle to Grid (V2G) technology is a bi-directional electric grid interface that allows a plug-in to take energy from the grid or put it back on the grid. Smart Grid City will use a realtime high-speed two-way communication throughout the distribution grid.

Grid 28