Remove Available Today Remove Installation Remove Oregon
article thumbnail

IKEA US and Electrify America to install ultra-fast public and fleet charging at more than 25 IKEA retail locations

Green Car Congress

This is the first time Electrify America and Electrify Commercial are installing both public and fleet chargers at the same time for a project. The first locations are expected to open in late 2022 and be completed by the end of 2023.

America 150
article thumbnail

A Design Landmark Reimagined as a Retreat

Baua Electric

The first three — a cherry red oversize hobo, an acid yellow cross-body tote and a spherical black bucket bag — are available today. The outdoor table, set in a grove of Oregon white oak, is a ribbon of concrete that was poured on-site and hand inlaid with rocks from the vineyard, with room enough for six seating areas.

Design 52