Remove Available Today Remove Grid Remove Long Beach
article thumbnail

Electrify America to install 30 charging stations with battery energy storage at the Port of Long Beach for drayage trucks

Green Car Congress

Electrify America plans to install 30 electric fleet-dedicated chargers paired with battery energy storage systems (BESS) at the Port of Long Beach, California, as part of Electrify America’s $25-million “Green City” investment in the region at the Ports of Long Beach and Los Angeles.

article thumbnail

Electrify America unveils its first application of megawatt-level energy storage

Green Car Congress

The megawatt-level energy storage system combined with a solar canopy goes a step further than Electrify America’s existing BESS in managing energy costs and reducing stress on the grid by acting as a buffer to supplement power to charging stations when local utilities limit the amount of power a station can draw from the grid.

article thumbnail

Cal Energy Commission grants $2.4M for Class 8 fuel cell hybrid trucks at ports; $1.2M for PEV fleet and V2G software upgrade

Green Car Congress

million to the South Coast Air Quality Management District (SCAQMD) under the Alternative and Renewable Fuel and Vehicle Technology Program to build and to test seven hybrid fuel-cell, Class 8 trucks to transport cargo at the Long Beach and Los Angeles ports. gallons per minute models available today.