GM’s Volt Program = $700m
Revenge of the Electric Car
DECEMBER 28, 2009
litre engine-generators; $43m for a plant in Brownstown Township outside Detroit that will manufacture battery packs; $37m for a camshaft and connecting rod plant in Bay City, north of Flint; and $27m for GM’s Tech Center in suburban Warren, a Detroit suburb, location of Volt’s battery laboratory.. Michigan has approved $135.2m
Let's personalize your content