The US’s largest battery-grade lithium refinery will be in Oklahoma
Baua Electric
JANUARY 17, 2024
It will use Port Muskogee on the McClellan-Kerr Arkansas River Navigation System to ship lithium brine water to the refinery, where it will derive the lithium, and then use the same inland waterway system to ship battery-grade lithium out. Muskogee also has a skilled workforce trained in oil and gas engineering. Get started here. –ad*
Let's personalize your content