article thumbnail

Watch this robot install solar panels in Arizona [video]

Electrek

Terabase Energy has successfully completed its first commercial solar installation using Terafab, its automatic solar-installing robot. more… The post Watch this robot install solar panels in Arizona [video] appeared first on Electrek.

Arizona 137
article thumbnail

IKEA boosts gigascale output at an Arizona solar panel factory

Electrek

IKEA’s investment arm is going to buy Arizona-made solar modules from Swiss solar panel maker Meyer Burger from 2025 to 2029. more… The post IKEA boosts gigascale output at an Arizona solar panel factory appeared first on Electrek.

Arizona 130
article thumbnail

A Swiss solar company announces a new production facility in Arizona

Electrek

Swiss solar technology company Meyer Burger announced today that it is opening a production facility for high-performance solar modules in Goodyear, Arizona – its first factory in the US, and its first outside of Europe. Solar module production is scheduled to begin by the end of 2022.

Arizona 145
article thumbnail

Tesla solar-powered “V4” Supercharger station coming to Arizona

Teslarati

Tesla’s first solar-powered V4 Supercharger station might be coming to Yuma County, Arizona. According to Tesla Supercharger connoisseur @MarcoRPTesla , the V4 Supercharger station in Arizona is located by the Dateland Travel Center along Interstate 8. Tesla is also building two solar arrays spanning 4500 sq.

Arizona 98
article thumbnail

Arizona State Students Develop a Solar-Powered Air Filtration System

Cars That Think

A team of students from the Fulton Schools of Engineering at Arizona State University is helping to improve the air quality for nomadic communities in Mongolia. The Project Koyash team at ASU designed a solar-powered air-filtration system that autonomously cleans polluted air in less than an hour.

Arizona 132
article thumbnail

Arizona is getting 200 MW of Tesla battery storage to meet rising energy demand

Baua Electric

The Flatland Energy Storage Project, which will be sited in south-central Arizona near Coolidge, will use Tesla Megapack 2XL lithium-ion battery storage. The location means the battery can store energy from both the solar park and the grid. The Flatland project will also boost the local economy. Get started here.

Arizona 52
article thumbnail

Tesla to install first 350kW V4 Supercharger with solar and Megapack in Arizona

The Driven EV News

Twitter sleuths unearth Tesla plans to build first V4 Supercharger station in Yuma County, Arizona, powered by solar and a Megapack battery. The post Tesla to install first 350kW V4 Supercharger with solar and Megapack in Arizona appeared first on The Driven.

Arizona 89