Remove Arizona Remove Miles Remove Wind
article thumbnail

EV Fun Run!

Electric Auto Association

Help us turn Route 66 into Electric Avenue Historic Route 66 Arizona Fun Run map The 34th annual Historic Route 66 Arizona Fun Run , going electric this year with the sponsorship of the Electric Vehicle Association in partnership with the Scottsdale EVA , is scheduled for Friday, May 5 through Sunday, May 7.

Arizona 96
article thumbnail

Opinion: Why Buffett Bet A Billion On Solar: Miles Per Acre Per Year

Green Car Congress

The cost to operate an EV, per mile, is already well below the cost to drive a standard ICE-age model, and the advantage is likely to widen. The average US residential customer pays 12 cents per kilowatt-hour (kWh) , which means the cost to drive one mile in an EV is somewhat less than 4 cents. Agua Caliente PV Plant: Yuma Arizona.

Miles 150
article thumbnail

2022 Lucid Air: The makers of the first 500-mile EV should be taken seriously

Charged EVs

And Lucid’s Dream Edition Range model includes a feature neither can offer: 520 miles of EPA-rated range, the highest among the dozens of EVs on sale for 2022. Tesla’s Model S Long Range has the smallest battery capacity of the three, at 100 kWh, from which it extracts 405 miles of combined EPA-rated range. How does that work?

Miles 143
article thumbnail

MIT study: half of US deaths related to air pollution are linked to out-of-state emissions

Green Car Congress

In general, the researchers find that when air pollution is generated in one state, half of that pollution is lofted into the air and carried by winds across state boundaries, to affect the health quality of out-of-state residents and increase their risk of early death. —Steven Barrett. Early-death source–receptor matrices for 2011.

MIT 307
article thumbnail

In the US, Ørsted forms its first-ever battery storage partnership

Baua Electric

This is Ørsted’s first standalone battery storage partnership both in the US and globally, but it already has a large existing portfolio of solar and storage projects, including the 40 MW storage project at Permian Solar Center in West Texas, and the 300 MW/1200 MWh battery storage at Eleven Mile Solar Center in Arizona (pictured).

article thumbnail

US power grid boosts capacity by 20.2 GW in the first half of 2024

Baua Electric

California, Texas, Arizona, and Nevada were the hot spots for these additions. The Gemini project also made headlines with its 380-MW battery storage, alongside Arizona’s 300-MW Eleven Mile Solar Center. Wind and nuclear power make their mark. Wind power also had a strong showing, adding 2.5

article thumbnail

Lucid faces difficult Q1 income questions later gradual gross sales

Baua Electric

The business newcomer delivered simply 1,406 automobiles within the January-March duration, neatly shy of the occasion had to meet its full-year forecast of between 10,000 and 14,000 Breeze sedans from its Arizona manufacturing unit. Within the wind-up to Monday’s income name, traders submitted questions for attention.