Remove Arizona Remove Available Remove Fleet
article thumbnail

Electrify Commercial collaborating with Arizona Public Service to provide statewide ultra-fast charging stations

Green Car Congress

Electrify Commercial will provide its charging equipment, networking, and customized services to support Arizona Public Service Company (APS) with its Take Charge AZ investment in electric vehicle (EV) fast charging. APS Take Charge AZ will expand access to electric vehicle (EV) charging throughout Arizona. Pricing is $0.31/kWh

Arizona 221
article thumbnail

Plug and Nikola partner; hydrogen supply, liquefaction and up to 75 Nikola Tre fuel cell trucks

Green Car Congress

Availability is expected to be 2H 2023. Nikola has awarded Plug the contract to provide one 30 TPD hydrogen liquefaction system for Nikola’s recently announced Arizona hydrogen hub. Nikola’s Arizona hub is currently going through the permitting and rezoning process, and procurement of long-lead equipment is underway.

Hydrogen 468
article thumbnail

TeraWatt developing I-10 network of electric heavy-duty charging centers

Green Car Congress

The I-10 Electric Corridor will consist of multiple facilities, called TeraWatt Charging Centers, that will be spread across California, Arizona, and New Mexico. The TeraWatt Charging Centers are located approximately 150 miles apart to support the mileage range of commercially available electric trucks.

El Paso 448
article thumbnail

EPA announces availability of $26M for projects to reduce diesel emissions from existing fleet

Green Car Congress

The US Environmental Protection Agency (EPA) announced the availability of $26 million in grant funding to establish clean diesel projects aimed at reducing emissions from the US’ existing fleet of diesel engines. Region 7 (Iowa, Kansas, Missouri, Nebraska): EPA is requesting proposals between $300,000 and $1,500,000.

EPA 150
article thumbnail

Lucid Motors completes first phase of construction of EV factory

Green Car Congress

We broke ground on the 590-acre Lucid AMP-1 site in Casa Grande, Arizona, on December 2, 2019, and slightly less than a year later we have completed the first purpose-built EV factory in North America. Lucid Air Pure joins the lineup in early 2022, available from $69,900.

Motors 414
article thumbnail

Voltera kicks off $150M expansion of electric fleet infrastructure

Baua Electric

Voltera is best known for its clever managed charging depots, which the company builds, owns, and operates for the benefit of local electric fleets. Voltera then charges fleets for access to its chargers, which it maintains and manages to ensure maximum uptime. The money’s there, but that’s not the only issue.

Fleet 52
article thumbnail

PNNL study finds 2028 grid resource adequacy likely sufficient for high EV penetration; managed charging strategies can double adequacy

Green Car Congress

The corresponding electric fleet sizes for the WECC footprint are 9 million LDVs, 70,000 MDVs and 94 HDV charging stations. The maximum number of LDVs when projected to the national fleet was about 30 million (national value) or 9 million for the WECC footprint. million for the WECC.

Grid 396