Remove Alternative Fuels Remove Maintenance Remove Puerto Rico
article thumbnail

See the Latest on NEVI 2023

EV Connect

The ambitious program aims to ensure that EV drivers have access to fast charging along the most frequently-traveled routes, which stretch for 75,000 miles along the nation’s Alternative Fuel Corridors (AFCs). Under the NEVI program, all states (as well as the District of Columbia and Puerto Rico) have access to NEVI formula funding.

article thumbnail

Where to Start with EV Charging for Convenience Stores & Truck Stops

Blink Charging

For example, if your truck stop or c-store is located within a designated Alternative Fuel Corridor (AFC) and you want to take advantage of the Department of Transportation’s National Electric Vehicle Infrastructure program (NEVI), then you would need to install a bank of at least four 150kW DC fast chargers DCFCs to receive that funding.

Store 95
article thumbnail

Select the Right EV Charging Management Partner for your NEVI Program Project

Driivz

Intended to remove the speedbumps from building a high-speed EV charging network along designated Alternative Fuel Corridors , NEVI grants cover up to 80% of the cost of new or upgraded EV charging infrastructure. It also demands that you provide a great driver experience.

article thumbnail

Three Major Sources of Funding for EV Charging at Convenience Stores and Truck Stops

Blink Charging

. $5 billion is allocated for the NEVI program, which will be used by the states for the establishment of an interconnected national network of direct current fast chargers (DCFCs) along designated Alternative Fuel Corridors. Eligible funding amounts : Projects located in alternative fuel corridors: $1,000,000 – no maximum.

Store 52
article thumbnail

Blink’s 2023 Year in Review

Blink Charging

We signed agreements to bring Level 2 charging to Arcos Dorados’s McDonalds franchises in Puerto Rico and to bring DC fast charging to Royal Farms convenience stores in the Mid-Atlantic. This year, Blink collaborated with leading brands to provide access to more EV chargers to more people.

article thumbnail

Biden to pour hundreds of millions into building EV charging stations

Baua Electric

The remaining $312 will go to 11 “corridor” recipients whose projects are located along roadways designated as Alternative Fuel Corridors, with the idea to fill gaps in the existing network. The project involves 22 states and Puerto Rico, with the total construction of about 7,500 EV charging ports.

article thumbnail

Everything You Should Know About the National Electric Vehicle Infrastructure Formula Program

EV Connect

The alternative fuel corridors in the U.S. On September 27, the Biden-Harris Administration announced it has approved Electric Vehicle Infrastructure Deployment Plans for all 50 States, the District of Columbia, and Puerto Rico ahead of schedule under the National Electric Vehicle Infrastructure Formula Program (NEVI for short).