Remove Alternative Fuels Remove DC Remove Grant Remove Miles
article thumbnail

Waffle House is getting NEVI DC fast chargers in Tennessee

Baua Electric

Photo: Waffle House EV charging company EnviroSpark is installing National Electric Vehicle Infrastructure (NEVI) program DC fast chargers at Waffle House in Lakeland, Tennessee. The NEVI Formula program requires EV charging stations to be available every 50 miles and within one travel mile of the Alternative Fuel Corridor.

article thumbnail

Where to Start with EV Charging for Convenience Stores & Truck Stops

Blink Charging

Convenience stores and truck stops are in a fantastic position to take advantage of available federal funding for DC fast charging stations. If you prefer EVs to charge for less than an hour, DC fast chargers can help your location serve more drivers per hour. Let’s look at some of the available funding for businesses.

Store 95
article thumbnail

Here’s where Virginia is installing its first 18 NEVI EV chargers

Baua Electric

Photo: Electrify America Virginia is handing out $11.295 million in federal grants to install 18 NEVI-compliant EV chargers – here’s where they’re going. This week, the Virginia Department of Transportation (DOT) announced the first round of National Electric Vehicle Infrastructure (NEVI) federal grant winners.

article thumbnail

Calif. Energy Commission to award more than $44M for hydrogen refueling and alternative fuel vehicle projects

Green Car Congress

In two packages of awards, the California Energy Commission approved more than $44 million to expand the hydrogen fueling infrastructure and increase the number of alter alternative fuel vehicles on the road in the state. Expanding hydrogen fueling stations in California. Alternative fuel vehicles awards.

article thumbnail

Three Major Sources of Funding for EV Charging at Convenience Stores and Truck Stops

Blink Charging

. $5 billion is allocated for the NEVI program, which will be used by the states for the establishment of an interconnected national network of direct current fast chargers (DCFCs) along designated Alternative Fuel Corridors. Eligible funding amounts : Projects located in alternative fuel corridors: $1,000,000 – no maximum.

Store 52
article thumbnail

How Government Incentives Help Convenience Stores Install Electric Vehicle Chargers

Blink Charging

With the National Electric Vehicle Infrastructure (NEVI) Formula Program and Charging and Fueling Infrastructure (CFI) Discretionary Grant Program, the United States will soon be connected from coast to coast by EV chargers. DC fast chargers are ideal for these locations because they can charge the typical EV in under an hour.

Store 104
article thumbnail

How did the National Electric Vehicle Infrastructure Program do in its first full year? – Charged EVs

Baua Electric

The program is administered at the state level, and the ultimate goal is to deploy 500,000 chargers along 75,000 miles of major US highways. All 50 states, plus Puerto Rico and DC, submitted their plans by the August 2022 deadline, but since then, some have made a lot more progress than others.