Remove 2018 Remove Gas-Electric Remove Manufacturer Remove Purchase
article thumbnail

TransLink orders 106 New Flyer CNG buses with 2018 Cummins L9N ultra-low NOx engines

Green Car Congress

The South Coast British Columbia Transportation Authority (TransLink) has awarded New Flyer with a contract for 106 Xcelsior compressed natural gas (CNG) forty-foot, heavy-duty transit buses. The NFI Group has more than 50 years of experience in manufacturing zero-emission buses (ZEBs). to 0.02g/bhp-hr. Earlier post.) Earlier post.)

2018 170
article thumbnail

GM and Honda jointly to develop two next-generation Honda EVs on GM platform and Ultium batteries

Green Car Congress

General Motors and Honda have agreed to develop jointly two all-new electric vehicles for Honda, based on GM’s highly flexible global EV platform powered by proprietary Ultium batteries. This includes work on fuel cells and the Cruise Origin, an electric, self-driving and shared vehicle, which was revealed in San Francisco earlier this year.

Honda 321
article thumbnail

Volkswagen Group 2014 sustainability report shows progress on key environmental performance indicators; Strategy 2018 and leadership in e-mobility

Green Car Congress

The Group now takes one-third of its electric power from renewable sources. Strategy 2018. The Group is currently driven by Strategy 2018— a set of action areas and measurable, defined strategic objectives for the year 2018 clustered into three primary areas: economy, people and environment. By 2018, “Think Blue.

2018 275
article thumbnail

$9.5M from California Climate Investments will support purchase of 10 battery-electric buses and solar charging stations

Green Car Congress

million to bring 10 battery-electric buses and supportive infrastructure to serve disadvantaged communities in the south San Joaquin Valley city of Porterville. GreenPower will build a manufacturing facility for all-electric buses and batteries, expected to open in 2018. California will award $9.5

Climate 150
article thumbnail

Proposed Changes to Federal EV Tax Credit – Part 2: End of the Manufacturer Sales Phaseout

EV Adoption

Arguably the biggest flaw in the Plug-In Electric Drive Vehicle Credit ( IRC 30D ) regulations is the triggering of a phaseout schedule of the tax credit when a manufacturer sells 200,000 total EVs (BEV and PHEV). In this part 2 article, we’ll dive deeply into the elimination of the per manufacturer 200,000 EVs sold phaseout.

article thumbnail

Proterra beats out BYD for Mineta San José International Airport electric bus contract; 10 Proterra electric buses to be in service by late 2018

Green Car Congress

The San José, California, City Council approved the purchase of ten Proterra Catalyst E2 battery-electric transit buses and related charging infrastructure for use at the Norman Y. Proterra’s E2 series 35-foot electric buses feature a 440 kWh battery pack to deliver an estimated range of 251 miles. Funded in part by a $3.8-million

BYD 150
article thumbnail

New Flyer to supply six battery-electric Xcelsior buses to Brampton Transit; CUTRIC supported zero-emission bus program

Green Car Congress

NFI), one of the world’s largest independent global bus manufacturers, announced the Canadian Urban Transit Research and Innovation Consortium (CUTRIC) and Brampton Transit have jointly secured $11.15 All participants of CUTRIC’s Pan-Canadian Electric Bus Demonstration and Integration Trial have now been funded.

Emissions 274