MAN Energy Solutions wins pre-engineering contract for methanation reactor in Power-to-X Plant
Green Car Congress
AUGUST 18, 2023
Koppö Energia has commissioned MAN Energy Solutions to deliver the front-end engineering design (FEED) for the methanation reactor of an industrial-scale power-to-X plant. The plant, with a total input capacity of 200 MW, will be built in Kristinestad, Finland for the production of green hydrogen and synthetic natural gas (SNG).
Let's personalize your content