article thumbnail

MAN supplying mixed medium- and high-speed engines for hybrid foundation/wind turbine installation vessels

Green Car Congress

MAN Energy Solutions has won a fourth order to supply engines to Chinese shipbuilder, COSCO Heavy Industries, in Qidong for the construction of a second F-Class installation vessel used for the installation of offshore wind turbines and foundations. X-class vessels are designed to operate at some of the most difficult sites.

Wind 259
article thumbnail

New York just installed its first offshore wind turbine

Electrek

The first wind turbine installation at South Fork Wind, New York State’s first offshore wind farm, is complete. more… The post New York just installed its first offshore wind turbine appeared first on Electrek.

New York 133
article thumbnail

China’s Goldwind installed a 16 MW offshore wind turbine in just 24 hours

Electrek

Chinese wind turbine maker Goldwind has installed its massive 16 megawatt (MW) offshore wind turbine in a “record-breaking” 24 hours. more… The post China’s Goldwind installed a 16 MW offshore wind turbine in just 24 hours appeared first on Electrek.

Wind 145
article thumbnail

Ulstein introduces second hydrogen vessel design: J102 hydrogen hybrid wind turbine installation vessel

Green Car Congress

The ULSTEIN J102 zero emission wind turbine installation vessel (WTIV), can operate 75% of the time in zero emission mode. Top view ULSTEIN J102 zero-emission turbine installation vessel. Emission reduction per installation cycle: 25%. The J102 has a kite-shaped hull allowing for large leg spacings.

Hydrogen 387
article thumbnail

Global installed wind power capacity just reached 1 TW

Electrek

After a 40-year effort, global installed wind power capacity reached 1 terawatt (TW) this month – but 2 TW will likely be achieved in less than seven years. more… The post Global installed wind power capacity just reached 1 TW appeared first on Electrek.

Wind 139
article thumbnail

Wärtsilä hybrid propulsion system with methanol engine to power four SAL heavy lift vessels; wind farm installations

Green Car Congress

They will also be the first methanol capable ships to employ a variable speed main engine in a hybrid installation. The ships are scheduled for delivery in 2025 and will be used mainly to support wind farm installations. —Dr Martin Harren, Owner and CEO of SAL Heavy Lift.

article thumbnail

A 14.3 MW offshore wind turbine was installed in just 30 hours

Electrek

Chinese wind giant Goldwind announced on social media today that it installed its 14.3 megawatt (MW) offshore wind turbine in “just 30 working hours.” MW offshore wind turbine was installed in just 30 hours appeared first on Electrek. more… The post A 14.3

Wind 134